Knowledge/Rebates and VEU/The VEU co-payment went up to $3,000 on 30 September 2026
The VEU co-payment went up to $3,000 on 30 September 2026
Under the Victorian Energy Upgrades (VEU) scheme, since 30 September 2026 the minimum your customer has to pay on a ducted reverse cycle upgrade has been $3,000 inc GST, up from $1,000. Multi-head systems at 10 kW and above went to $3,000 too. Single splits under 10 kW stay at $200. If you've seen 31 July quoted, that date's wrong.
- Ducted co-payment
- $3,000inc GST, was $1,000
- Applies from
- 30 Sep 2026not 31 July, see below
- Multi-split cap
- 20 kWmost you can claim, homes only
- Certificate price
- $85.80at 22 Sep 2026
What changed on 30 September?
Three things are hitting this work at once, and only one of them is getting talked about. The co-payment is what your customer pays out of their own pocket. It's not your margin and it's not what the certificates are worth. But it's the number that decides whether the job sells.
| System | Capacity | Until 29 Sep | From 30 Sep |
|---|---|---|---|
| Ducted reverse cycle | All | $1,000 | $3,000 |
| Multi-head split | 10 kW and above | $1,000 | $3,000 |
| Multi-head split | Under 10 kW | $1,000 | $1,000 |
| Single split | Under 10 kW | $200 | $200 |
A 20 kW cap on residential multi-splits
Once a multi-head job on a home passes 20 kW of capacity input, the extra size earns no extra certificates. Capacity input means the rated capacity of all the heads added up, but never more than the outdoor unit's rating. Put that next to the higher co-payment and large residential multi-split gets hit twice. If that's a decent chunk of your work, it's the part I'd reprice first.
And the certificate price isn't climbing to cover it
The scheme's yearly target, which sets how many certificates energy retailers have to buy and hand in, fell from 7.3 million tonnes of CO2 equivalent in 2025 to 4.4 million in 2026. That's roughly a 40 per cent cut in certificate demand. It's why the price of a VEEC (Victorian energy efficiency certificate) is sitting where it is rather than climbing.
Wrong date going around
So why do so many sites say 31 July?
We can't say for sure, but it looks like a misread of the same document. VEU Specifications v25.0 was published, and took effect as a document, on 21 July 2026. The co-payment clause inside it says the new figures are "applicable from 30 September 2026". Somewhere along the way 21 July seems to have become 31 July, and the clause got skipped.
The day a document takes effect and the day a clause in it applies can be two different dates. Anyone working to 31 July changed their quoting two months early and gave away margin on every job in between. If your supplier or rebate partner told you 31 July, they've read the cover and not the clause.
Can you still quote at the old co-payment?
Only if the certificate was created before 30 September. This one catches people out. The co-payment that applies is the one in force when the certificate's made, not when you quoted. And a certificate can't be made until the job's in. So a September quote for an October install, at the old co-payment, isn't a pricing mistake. It's a compliance problem.
- Plan off the install date, never the quote dateThe certificate always comes after the install. So any ducted or 10 kW plus multi-head job installed on or after 30 September carries the $3,000, even if you quoted it in August. A job installed just before the date but claimed after it is the grey area. Don't assume the old figure holds - check with your rebate partner before you quote it.
- Don't make up the difference for the customerYou can't give any of the co-payment back "in any form, including money, or other goods or services" (regulation 15A(1)(b)). Cash back, a free extra, a discount somewhere else on the invoice. Any one of them kills the certificate.
- Make the payment traceableThe customer has to actually pay at least the co-payment, and you need to be able to prove it. A payment that shows in the bank, at or above the figure, with nothing going back the other way.
- Reprice anything quoted before the dateIf you've still got quotes out from before 30 September at the old figure, redo them at the new one and tell the customer why. That conversation's a lot easier before the job than after it.
What does $3,000 do to a ducted job?
It doesn't just cut your margin. It makes the job harder to sell in the first place. Where your customer used to find $1,000 to change over, they've now got to find $3,000. That's a selling problem first and a pricing problem second, and it lands hardest on exactly the work this scheme's been pushing.
Put those three together. The scheme's been paying to get ducted gas out, ducted gas is most of what it's replaced, and from 30 September your customer's share of that changeover triples.
Is there really a 77 VEEC cap?
No. It's been repeated enough to sound official, so let's be plain about it. There's no cap on the number of certificates. Every time 77 appears in the 165 page Specifications, it's a page number, a postcode, a footnote marker or a number inside a formula.
The real limit is the 20 kW capacity input cap on residential multi-splits. Our best guess is the 77 started life as a certificate price, around $77 a VEEC, and got retold as a rule.
What should you do now?
- Pull every open ducted quote with an install date on or after 30 September and reprice it.
- Check your rebate partner's paperwork for the 31 July date. If it's there, they've got it wrong.
- Check your site photos still carry their location. Geo-tagged photos have been mandatory since 23 April 2026, and messaging apps wipe the location out.
- Work out how you're going to have the $3,000 conversation before a customer raises it. The ones who handle it well will be the ones who've rehearsed it.
Not sure how to reprice your ducted work?
This is the sort of thing that's better talked through than read about. Kevin's been in this industry 30 years and he's watched a few of these scheme changes land.
Tell him what your ducted pipeline looks like between now and Christmas and he'll tell you where he'd move first.
Who this is for: small and medium HVAC contractors in Victoria. If you're a homeowner after a rebate or a repair, you need a licensed contractor, not us, and yours can point you the right way.
Related
- What's a VEEC actually worth, and why isn't it climbing?A VEEC was $85.80 on 22 September 2026, inside a 12 month range of $74.50 to $93.50. Here's what sets the price, and why $100 is the practical ceiling.
- Geo-tagged photos, and the app that quietly deletes themSince 23 April 2026, VEU heating, cooling and hot water jobs need geo-tagged photos. Messaging apps strip the location, and your audit evidence with it.
- When a VEU claim fails, who actually carries it?The accredited provider and the installer don't carry the same risk when a VEU claim fails. The regulator's own enforcement cases show how that plays out.
- Can you claim STCs and VEECs on the same job?On heat pump hot water you can claim both certificates, and that's deliberate. On residential solar or a battery, claiming both is an offence.
Review date: 1 November 2026. Figures in this area change without much notice and this page carries some that will go stale. Every number above is dated and sourced so you can check it yourself. If you find something out of date here, tell us and we will fix it.