Knowledge/Install and commissioning/Duct sizing, bends and return air on gas ducted heating
Duct sizing, bends and return air on gas ducted heating
Ceiling outlets want 50 to 70 litres per second (L/s) and floor outlets 45 to 55 L/s, based on a 150 mm outlet. Upsize the duct 50 mm past 6 metres and 100 mm past 9. Minimum bend radius is 1.5 times the diameter up to 300 mm duct. Return air duct is 3 metres minimum, with a bend.
- Ceiling outlet
- 50 to 70 L/sbased on 150 mm outlet
- Floor outlet
- 45 to 55 L/sbased on 150 mm outlet
- Past 6 m and 9 m
- +50, +100 mmspigot and duct, full run
- Return air duct
- 3 m minimumincluding a bend
What are the supply side rules?
- Airflow per outletCeiling 50 to 70 L/s, floor 45 to 55 L/s, both based on a 150 mm diameter outlet. Floor outlets should blow sideways rather than straight up.
- Upsize long runsIf the duct run is over 6 metres, go up 50 mm on the spigot and the duct. Over 9 metres, go up 100 mm. Do it for the full length of the run, not just the far end.
- Respect the bend radiiMinimum bend radius is 1.5 times the duct diameter for 150 to 300 mm duct, and 2 times the diameter for 350 to 400 mm duct. A tight bend chokes the airflow (it adds static pressure), and you pay for it every minute the system runs.
- Leave one outlet openOn a zoned system, keep at least one outlet fully open whenever the heater is running. If the zoned system has a single controller, the return has to be in the common zone, the one that's never shut off.
How big does the return air grille need to be?
This is one of the most useful tables in the manual, and it rarely gets quoted. Add a filter and the return grille has to be a lot bigger than most people expect.
| Model | Grille without filter | Grille with filter |
|---|---|---|
| TQ315, TQ320 | 500 × 400 mm | 750 × 400 mm |
| TQ3X20, TQ325 | 600 × 400 mm | 900 × 400 mm |
| TQ3X25, TQ330 | 750 × 400 mm | 1000 × 400 mm |
| TQ3X30 | 900 × 400 mm | 1200 × 400 mm |
Keep that table in mind on a conversion quote. A reverse cycle indoor unit always has a filter and a coil, so the old gas return grille is the first thing that won't be big enough.
The rest of the return rules
- Return air duct at least 3 metres long, with a bend in it to cut noise
- Grille at low level, in a central hallway
- Not in a bathroom or a laundry
- Not recommended above 2.7 metres
- This heater isn't suitable for outside return air
- A door relief grille, or a big enough gap under any door that would block the path from outlet back to return
What should you tell the customer about the filter?
The manual asks for the filter to be cleaned every two weeks and replaced every year. Few householders do either.
That matters to you because a blocked return filter is a common cause of the overheat fault family. When you hand over a new system, showing the customer where the filter is and how to pull it out saves you a callout you'd probably end up wearing.
What are the flue and condensate rules?
- 100 mm metal flue, approved by the AGA (Australian Gas Association)
- Twin wall for any enclosed part, and recommended beyond 2 metres
- Maximum vertical rise 5 metres
- 500 mm from the nearest opening, and from an electricity meter or fuse box
- 1000 mm horizontally, in the direction of discharge, from an openable window, door or non-mechanical air inlet
- Condensing models need a condensate drain with continuous fall, unobstructed, draining freely and holding no water
External clearances follow the Australian and New Zealand Standard AS/NZS 5601. Size the gas pipe so the heater inlet still gets 1.13 kPa on natural gas, or 2.75 kPa on propane, with every other gas appliance in the house running flat out.
Chasing a figure the manual doesn't give you?
Some of them genuinely aren't published, and some of them are published somewhere nobody thinks to look. Either way you shouldn't be guessing.
Tell Kevin what you're after and he'll point you at it or tell you it isn't there.
Who this is for: small and medium HVAC contractors in Victoria. If you're a homeowner after a rebate or a repair, you need a licensed contractor, not us, and yours can point you the right way.
Related
- Relief air, and the two tests that prove you have enoughTwice the vent area per room, and two field tests you can run with no instruments at all. Plus the published ratio that doesn't exist, whatever you've heard.
- Commissioning the water side of an evaporative coolerSupply pressure, water level, prewet and the pad flush. Plus two plumbing traps, one that stops the water shutting off and one that locks up the solenoid.
- Add-on cooling needs a second thermistor, and here's whyA cold coil in the supply duct soaks up the heat rise the heater looks for to confirm it has lit. That's why V1.10 boards onwards want two thermistors.
- The outlet thermistor goes 3 metres down the supply ductAbout 3 metres down the supply air duct, never in the return, and never in a zone that closes. Get it wrong and the heater shuts down after 90 seconds.
Review date: 1 April 2027. Figures in this area change without much notice and this page carries some that will go stale. Every number above is dated and sourced so you can check it yourself. If you find something out of date here, tell us and we will fix it.